University of Idaho - I Banner
A student works at a computer

SlateConnect

U of I's web-based retention and advising tool provides an efficient way to guide and support students on their road to graduation. 登录SlateConnect.

联系

Idaho Water 资源 研究 Institute

邮寄地址:
University of Idaho 博伊西
爱达荷水中心
东前街322号. 套房440 e
博伊西,ID 83702

电子邮件: iwrri@226101.com

谷歌地图

物理地址:
1031 N. 学术的方式,
216套房
心d 'Alene, ID 83814

电子邮件: iwrri@226101.com

谷歌地图

管理水位 in Coeur d’Alene Lake

This story was written by Meghan Lunney, Avista’s Spokane River license manager, as part of the 我们的宝石 series in the CDA Press. It ran in the paper Sunday, Feb. 28, 2021. Read the original article.

Coeur d’Alene Lake was created after the last period of glaciation by a natural restriction at its outlet, the start of the Spokane River. 在19世纪90年代, Fredrick Post constructed a mill and three dams nine miles downstream on the river at what is now called Post Falls. Avista purchased the site and rebuilt the dams, providing hydropower beginning in 1906.

The three dams span between two islands, connecting the north and south shores of the river. The north and south channel dams are spillways and the middle channel dam includes the powerhouse where water is passed through six turbines to spin generators and make electricity.

For simplicity, people refer to the Post Falls “Dam,” rather than three dams. Many people are surprised to learn that the Post Falls Dam only affects the lake’s elevation and Spokane River flows five to seven months out of the year. Every year is different due to nature’s variability.

Each year during winter and spring, the lake level and downstream river flows can fluctuate widely, all due to a combination of temperature, precipitation and snowmelt. 在此期间, whatever water flows out of the lake simply passes through the Post Falls Dam, and the lake reaches its own natural elevation.

This free flow continues until the end of spring runoff, which is typically between late May and early July, depending on snowpack and weather. Once spring runoff flows recede and diminished flows into the lake are forecast, Avista can close spill gates at the dam. This begins to fill the nine-mile stretch of the Spokane River between Coeur d’Alene Lake and Post Falls Dam.

Avista regulates flows until the lake elevation is at or near 2,128英尺, and forecasts indicate that the remaining snowpack or forecasted storms will not push the lake above this level. 整个夏天, Avista adjusts the river flow rate to match inflows, keeping the lake at a steady elevation.

在夏天, Avista is required to release at least 600 cubic feet per second (cfs) of river flows from the Post Falls Dam at all times. If the elevation of Coeur d’Alene Lake drops more than three inches below summer level, the flows must be reduced to 500 cfs. Following the Tuesday after Labor Day, Avista begins to draw water from the lake, both to generate electricity and to provide room in the lake for rain or other precipitation.

Avista cannot cause the lake to go above 2,128英尺 by its dam operations. When the lake and river are on free-flow conditions, 然而, the lake sometimes rises as much as seven feet or more above 2,128英尺, as inflows greatly exceed the natural outflow capacity of the Spokane River.

You can access water flow information and notifications of anticipated elevation changes on the lakes and rivers on the Avista网站 or call the 24-hour information lines at 208-769-1357 in Idaho or 509-495-8043 in Washington. The recorded information is provided to advise shoreline property owners and commercial and recreational users of changing level that may affect plans for water use. Keep an eye out for high-water events to avoid losing belongings, yard waste or other pollutants to the water.

联系

Idaho Water 资源 研究 Institute

邮寄地址:
University of Idaho 博伊西
爱达荷水中心
东前街322号. 套房440 e
博伊西,ID 83702

电子邮件: iwrri@226101.com

谷歌地图

物理地址:
1031 N. 学术的方式,
216套房
心d 'Alene, ID 83814

电子邮件: iwrri@226101.com

谷歌地图